电气工程英文简历范文
很多简历,内容庞杂,形式混乱,贪多求全,恨不得把所有的事情都写上,结果,大杂烩,反倒让人搞不清楚究竟应聘者究竟想表达什么。不同的经历,展示不同的'能力,同一经历,不同的描述,也能展示不同经历。写的混乱,只会让人觉得应聘者思维混乱、主次不分、目标不明。你想成为什么样的人,就把自己塑造成什么样的人,不要奢望招聘者当伯乐。
篇一:电气工程英文简历范文
yjbys
(male, 33 years old)
Highest degree: college degree | working experience: more than 10 years professional | : electronic information science class
Marital status: married | body high is 170 cm
Cadastral penetration: jiangxi at | dwelling place: xinyu
Job status: I left my job now, can arrive quickly
Eloquence good affinity can drive Honest and trustworthy The personality is bright
objective
Anticipated salary: negotiable | nature of work: full-time
Expect areas: YuShui area, at economic development zone, at the economic hi-tech development zone | expected industry: real estate development, construction and engineering, new energy/water/electricity
Expect jobs: the builder, electrical engineering, water supply and drainage
Self description
I was born in 1984, is at the locals, nanchang institute of technology, the electronic commerce specialized graduation, has engaged in the more work, but do the longest in the hydro - LDK decoration and installation industry. Resume some jobs don't write, because time is relatively short. I think I am a down-to-earth, can bear hardships and stand hard work, my ability to learn and draw lessons from at the same time, to new things and new technologies can be faster to master! I still want to have a better income, relatively stable work, because it seems to me that life is not necessarily to ups and downs, astounding. I pursue of, it is very simple
Education experience
In September 2003 - July 2006 | nanchang institute of technology | | electronic commerce college
Work experience
In January 2011 - | | hydropower construction personal so far
Have been engaged in water and electricity installation and decoration on this, the main work have pack level tooling repair. Has done a lot of electricity and decorate a family to decorate, also done some 1000-2000 square area stores, real estate sales department, office items such as water and electricity installation and decoration, fire and weak current installation, etc. I still more in the decoration of hydropower station, due to the nature of the industry determines the, work is not stable, I so want to be able to engage in decorate and hydropower and other equipment or installation work. Hope to have a need to this aspect of the staff of the company can give the opportunity, I will do the work well.
In July 2007 - January 2011 | line monitor | LDK solar high-tech co., LTD
Responsible for silicon wafer cutting production, production efficiency, quality, personnel management, and other daily work.
In July 2006 - June 2007 expatriate salesman | | province henan zhengzhou zhisheng trading co., LTD
Is mainly responsible for the company and the company's products sales and distribution, because it is a manufacturer of assigning the salesman, so the center of the work or work is given priority to, is to assist the agent to promote the company's products sales work
Language ability
Introduction to English |
To get the certificate
Electronic commerce assistant engineer | in January 2006
English level 3 | 1 January 2006
The electrician certificate | in January 2015
篇二:电气工程英文简历范文
yjbys
(male, 27 years old)
Highest degree: college degree | working experience: 5-10 years | profession: other classes
Marital status: married
The latter: xinyu
Job status: I left my job now, can arrive quickly
objective
Anticipated salary: negotiable | nature of work: full-time
Expect areas: xinyu | expectations: the industry of construction and engineering
Expect jobs: water supply and drainage, municipal engineering, electrical engineering
Self description
I very easy to work units belonging (or interpreted) loyal.
Site management experience, familiar with CAD, visionbank of engineering software, etc.
Good communication and coordination ability, a strong sense of responsibility, confined ability.
Have the team cooperation consciousness, self-motivated, adapt to the work environment, ready to meet various challenges.
Familiar with from the site starts to project completion stage all work related to water and electricity equipment node, cost control, quality control points.
Details for the engineering quality demand is high, and strive to to control the engineering cost.
Education experience
In September 2008 - July 2011 | | | water supply and drainage engineering college nanchang engineering institute
Work experience
In September 2013 - yet competent hydropower equipment | | new wang lung real estate development co., LTD
1, responsible for the project before start working eight league review, applying construction drawings optimization, data collection;
2, participate in hydropower design drawings audit;
3, participate in all equipment related work matters of contract preparation, audit;
4, responsible for all equipment working progress payment for examination and approval;
5, declare all equipment related work of construction materials;
6, deal with problems on the construction site, be responsible for the change, visa;
7, responsible for docking with the water, electricity, gas supporting unit coordination and acceptance;
8, responsible for water and electricity related work (lightning protection, civil air defense equipment, fire control, security, municipal pipelines, etc.) the completion inspection and acceptance of work;
9, complete other tasks arranged by the project manager.
In July 2011 - September 2013 hydropower equipment engineer | | jiangxi prudential real estate co., LTD
Responsible for building water supply and drainage, outdoor pipe networks and coordinate with tap water, gas company, etc.
【电气工程英文简历范文】相关文章:
本文来源:https://www.010zaixian.com/zuowen/qingchunsuixiang/3523373.htm